• Home
  • Products
    • Compact Series (PPC)
    • Micro Series (PPM)
    • Electro-Pump Bull Series (EPB)
  • Catalogs
  • FAQ
    • Technical
    • Components
      • Central Manifolds
      • DC Motors
      • Plastic Tanks
      • Plugs
    • PPC Technical
    • PPM Technical
  • Locations

Call us toll free 704-992-8211

Find us on Map
info@hydronitamericas.com
Login

Login
Hydronit AmericasHydronit Americas
  • Home
  • Products
    • Compact Series (PPC)
    • Micro Series (PPM)
    • Electro-Pump Bull Series (EPB)
  • Catalogs
  • FAQ
    • Technical
    • Components
      • Central Manifolds
      • DC Motors
      • Plastic Tanks
      • Plugs
    • PPC Technical
    • PPM Technical
  • Locations

Frequently Asked Questions

Home » What are the instructions for commissioning a unit?

What are the instructions for commissioning a unit?

  • After connecting the electric motor and the suction pipe, check the direction of rotation of the pump with pulses of 1÷2 sec. For standard pumps, the direction of motor rotation must be clockwise as viewed from the side of the motor fan.
  • Flush the oil at atmospheric pressure in order to remove any impurities and air bubbles from the circuit.
  • Connect all devices to the system and gradually increase oil pressure.
  • Check the oil level and, if necessary, fill up to the maximum level.
  • To ensure a correct and long-lasting operation, check the oil after 100h from commissioning and replace it every year or 300h of use whichever comes sooner.

 

For full instructions see:

Hydronit Instructions For Installation and Use

 

PPC TechnicalPPM TechnicalTechnical
0

Recent Posts

    Hydronit Americas
    Modular compact power units for your application.

     

    Get started today.

    Contact Info

    • Hydronit Americas
    • 10800 Twin Lakes Pkwy. Charlotte, NC 28269
    • 704-992-8211
    • info@hydronitamericas.com
    • hydronitamericas.com
    Terms & Conditions

    © 2025 · Hydronit Americas